Daily Log: JV

5/5/16

Today we set up this blog.

5/10/16

Today I learned how to solder and had the interview.

5/12/16

Today I soldered a bit of the control box but I did not finish. I did finish Strip the power cord and putting on the alligator tips. I plan to finish by next class.

5/13/16

Today I finished the control box but during testing it did not pass for one of the switches was not working. Mrs. S gave our group an old control box after trying to fix the box.

5/16/16

Today we finished mounting the motors and were able to test our ROV in the water it seems as everything is going well and that we have a working ROV. I believe that we are plan to work on the making adjustments to do the challenges and focus on operation Fix it.

5/20/16

Today we tried to to work on the operation fix it challenge with a coat hanger but it failed. We will have to try and find a better way to fix the problem.

5/24/16

Today we worked on operation fix it and managed to engineer a way to cap the valve. We made many fish hooks out of a hanger and fishing string. We able to cap the valve today due to these fish hooks it just takes a lot of work to control the ROV in a way to pick it up.